Aramco – HDPE Lining Installation in Evaporation Pond

Project Overview

Neima Gulf was engaged by Aramco to replace and install HDPE lining systems in multiple evaporation ponds, critical for environmental safety and operational performance.

Scope of Work

  • Removal of existing damaged HDPE lining
  • Installation of new lining across multiple ponds
  • Compliance with Saudi Aramco’s strict quality standards

Challenges

Executing the installation under challenging environmental and safety conditions, requiring specialized expertise and strict adherence to regulations.

Outcome

Delivered a durable, compliant, and high-quality HDPE lining system that ensures operational reliability for Aramco’s evaporation ponds.

Ready to Build with Confidence?

Partner with Neima Gulf for engineering solutions that last a lifetime.

A trusted partner for construction and infrastructure solutions, building efficient, sustainable, and future-ready projects across Saudi Arabia.